Chemical Pump Replacement Checklist for Requesting a Quote

HMX and CQB pumps on the chemical pump replacement checklist cover

Get Product Catalog & Support

Fill out the form to get full specs and case studies.

Use this chemical pump replacement checklist to collect four things before requesting a quote: the installed pump’s identity, the duty the replacement must deliver, the dimensions it must fit, and the reason for replacing it. Start with clear photos of the pump and motor nameplates. Then add the actual liquid, required flow and head, and any restrictions on changing the piping or base.

The most useful detail is often what the replacement needs to do differently. If you need to restore the original flow, include the last reliable operating readings. If the process has changed, explain what changed and give the new requirement. That helps the supplier select for the job the pump will perform after installation.

Photograph the pump nameplate, the motor nameplate, and the complete installed assembly. The full installation photo should show the inlet, discharge, base, and space around the motor. If the plate is faded, include the original purchase record or approved drawing when available.

ItemWhat to send with the quote request
Pump identityManufacturer, full model code, serial number if available, and photos of the pump from the connection and motor sides. Include all suffixes.
Motor identityMotor output, voltage, phase, frequency, rated speed, and frame or mounting type if shown. Mention whether a variable-frequency drive is installed.
Replacement scopeState whether you need a complete pump and motor assembly, a pump assembly for use with the existing motor, or specific spare parts.
Reason for replacementDescribe the symptom and when it began, such as steady loss of flow, repeated repairs, or a change in liquid or production duty.

Include any changes made since the pump was installed. A new motor, modified piping, or changed pump internals can make the original purchase record incomplete. For a parts-only request, add the existing part number, photos of the part, and its location on the assembly.

HMX pump beside a checklist for pump and motor nameplates and a photo of the installed assembly

2. State the Flow and Head the New Pump Must Deliver

Give the required flow and total head as a pair, with units. For example, an engineering request could read “100 L/min at 15 m total head.” This is an illustrative duty point. Use your own process requirement and identify it as measured, calculated, or estimated.

If you have operating records, send the normal duty and any meaningful minimum or maximum condition. Include the pump speed or operating frequency at the time the readings were taken. A worn pump’s current flow can be lower than the process requires, so include the last known satisfactory readings or the original design duty if available.

If total head is unknown, send the information you already have:

  • Suction and discharge pressure readings, with units and gauge locations.
  • Minimum and maximum liquid levels, measured relative to the pump centerline if available.
  • The piping route, including pipe sizes, elevation changes, and major valves, filters, or other restrictions.
  • Any condition that changes system resistance, such as a clean filter versus a loaded filter.

A single discharge-gauge reading is useful when its location and operating conditions are known. The supplier can use the combined information to review how the proposed pump curve fits the system. Hydraulic Institute guidance on pump and system operating points

3. Include the Process Liquid and Cleaning Conditions

Write down the chemical name, normal concentration and temperature, and any limits that occur during production, startup, or cleaning. Include the safety data sheet or process specification if available. For mixtures, give the composition or concentration range you know.

Provide specific gravity, viscosity, and solids information where available. If the liquid carries particles, describe their source, approximate size, and whether they tend to settle or build up. Mention any cleaning or flushing liquids that also contact the pump. The supplier needs these details to review the casing, impeller, shaft, bearings, and seals in the proposed configuration.

For an HMX inquiry, send the complete model code so the installed materials can be checked against your records. The HMX catalog lists separate codes for pump material, shaft, bearing, and elastomer. If your records only identify the casing material, include a parts list or previous order sheet so the remaining components can be reviewed. HENNVI HMX model identification

4. Check the Mounting and Connections Before Ordering

If the replacement must fit an existing skid or pipe layout, send a dimensioned sketch or the current drawing. Measure from a fixed reference, such as the base surface or suction flange face. On a tight skid, show where the motor and pipe connections sit relative to that reference.

Fit checkWhat to record
Suction and dischargeNominal size, flange standard if known, bolt-circle diameter, number and diameter of holes, flange face, and connection orientation.
Pipe alignmentSuction centerline height and the position of each flange face relative to the base or another fixed reference.
Mounting baseBase dimensions, mounting-hole spacing, and how the existing pump is supported.
Service accessAvailable length, width, and height, plus room to remove the motor or pump for maintenance.
Electrical fitAvailable voltage, phase, and frequency. State whether the existing motor, starter, or drive must be retained.

Two Examples From the HENNVI Product Documents

The HMX-452 and HMX-452H are both listed with 50 × 40 mm inlet and outlet sizes and 1.5 kW motor output. The HMX catalog provides separate performance entries for the two variants. Include the final H where it appears on the existing unit and confirm the operating frequency before the supplier checks the curve. HENNVI HMX performance specifications

The CQB50-32-125 and CQB50-32-160 illustrate a physical fit check. Both use DN50 suction and DN32 discharge designations. Their bolt-circle dimensions differ in the CQB manual:

Manual dimensionCQB50-32-125CQB50-32-160
Suction flange bolt-circle diameter110 mm125 mm
Discharge flange bolt-circle diameter90 mm100 mm
Overall length L633 mm653 mm

These values come from the CQB manual’s mounting and flange tables, printed pages 07–08. For an actual replacement, compare both existing connections with the dimensional drawing for the exact assembly being quoted. HENNVI guide to chemical pump flange compatibility

CQB50-32-125 and CQB50-32-160 comparison of suction and discharge bolt circles and overall length

5. Make the Quotation Easy to Compare

Tell the supplier whether the replacement must reuse the existing piping and base, or whether modifications are acceptable. Then ask the supplier to state the proposed model and configuration, which items are included, and what remains to be confirmed.

For a complete pump replacement, request the performance curve at the quoted speed or frequency, the dimensional drawing, and the wetted-material list. If a motor, base, mating flange, or adapter is included, ask for it to be listed. Compare quotations against the same duty point and installation requirements so you know what each offer covers.

If the pump is down and you only have the nameplate and installation photos, send those with the current symptom and the required delivery date. Mark any missing readings or dimensions as to be confirmed. This gives the supplier enough information to identify the equipment and ask focused follow-up questions.

Chemical Pump Replacement Checklist for Your RFQ

Send the completed chemical pump replacement checklist with clear photos of both nameplates and any available installation drawings.

Pump quote checklist covering model and scope, flow and head, liquid conditions, mounting, and power supply

Existing manufacturer and full pump model:
Serial number or equipment tag:
Replacement scope (complete pump, pump assembly, or spare parts):
Reason for replacement and what needs to change:

Required flow and total head, with units:
Last known stable flow or pressure readings and gauge locations:
Minimum and maximum source tank levels, if known:
Liquid name, concentration, and operating temperature:
Specific gravity, viscosity, or solids, if known:
Cleaning or flushing liquids:

Suction and discharge connections:
Flange bolt-circle diameters and hole details, if known:
Base dimensions and available service clearance:
Site voltage, phase, frequency, and speed control:
Piping, base, or motor that must be retained:

Quantity, delivery location, and required date:
Attachments (nameplates, installation photos, sketch, or drawings):

Please include the proposed model, scope of supply, performance curve,
wetted materials, and dimensional drawing. List any items that still
need confirmation before the replacement can be selected.

Send the completed checklist with your nameplate photos and drawings. If the process or piping changed before the old pump stopped meeting its duty, include that detail so it can be reviewed alongside the replacement. Request a chemical pump replacement quote from HENNVI

Need a Reliable Pump Solution for Corrosive Applications?

Hennvi Pump provides engineered chemical pump solutions including magnetic drive pumps, diaphragm pumps,centrifugal pumps, dosing pumps,vertical pumps and filtration systems for industrial applications. Share your working conditions and requirements with us. Our technical team will provide professional suggestions, datasheets and competitive pricing for your fluid‑handling solution.

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top